HQ Patch Schedule |
|||||||||||||||||||||||||
Intra-Data Center WAN Device Cross Connects |
|||||||||||||||||||||||||
*** Please note that fiber uplinks between switches MUST be crossed. For the consistency purpose, a cross of a patch cord should occur at the Core, Primary or Secondary Rack end. | |||||||||||||||||||||||||
Switch/Device | Device Port # | Patch Location | Patch Location | Patch Location | Patch Location | Switch/Device | Device Port # | ||||||||||||||||||
Row Desig | Rack # | Panel # | Port # | Row Desig | Rack # | Panel # | Patch Port # | Row Desig | Rack # | Panel # | Port # | Row Desig | Rack # | Panel # | Port # | ||||||||||
NYHQ-WAN-ES01 | 2/1 | WA | 1 | 3 | B1 | ® | SL | 4 | 2 | L1 | NYHQ-BB-ES01 | 3/1 | |||||||||||||
NYHQ-WAN-ES01 | 2/2 | WA | 1 | 3 | A1 | ® | PL | 4 | 2 | L1 | NYHQ-BB-ES02 | 3/1 | |||||||||||||
NYHQ-WAN-ES01 | 2/3 | WA | 1 | 3 | A2 | ® | PL | 4 | 2 | L2 | NYHQ-BB-ES03 | 3/1 | |||||||||||||
NYHQ-WAN-ES01 | 2/4 | WA | 1 | 3 | B2 | ® | SL | 4 | 2 | L2 | NYHQ-BB-ES04 | 3/1 | |||||||||||||
NYHQ-WAN-ES02 | 2/1 | WA | 2 | 3 | B1 | ® | SL | 4 | 2 | K1 | NYHQ-BB-ES01 | 3/2 | |||||||||||||
NYHQ-WAN-ES02 | 2/2 | WA | 2 | 3 | A1 | ® | PL | 4 | 2 | K1 | NYHQ-BB-ES02 | 3/2 | |||||||||||||
NYHQ-WAN-ES02 | 2/3 | WA | 2 | 3 | A2 | ® | PL | 4 | 2 | K2 | NYHQ-BB-ES03 | 3/2 | |||||||||||||
NYHQ-WAN-ES02 | 2/4 | WA | 2 | 3 | B2 | ® | SL | 4 | 2 | K2 | NYHQ-BB-ES04 | 3/2 | |||||||||||||
NYHQ-FWA-AS01 | FA0/1 | WA | 1 | 1 | 13 | ® | SL | 5 | 1 | 1 | NYHQ-BB-ES04 | 5/16 |